Geyer Road Resurfacing: Punchlist Items - Paving completed August 2024
This project from Adams Ave. to Big Bend Blvd. includes removing 2" of the asphalt surface, 2" asphalt overlay, spot curb repair, ADA curb ramp reconstruction, crosswalk and traffic signal replacement, and pavement markings for bicycle facilities. The at-grade railroad crossing will be reconstructed to provide ADA-compliant sidewalks and improve the vertical profile of the roadway for vehicles. Rectangular Rapid Flashing Beacons are being proposed to be installed with this project, at the midblock crosswalks at Nirk Ave. and Jefferson Ave. The STP federal program partially funds this project. Right-of-way acquisition took place in the fall of 2022. Construction of the project is underway and paving, weather permitting, is anticipated to be completed during August of 2024.
This letter was sent to residents in the area in November 2023.
Raineri Construction sent this letter dated 12.21.2023 out to residents.
The Geyer Road Resurfacing plans can be viewed here.
STP-5502(609) Geyer Road Resurfacing Phase II | ||
Limits: |
West Adams Avenue to Big Bend Boulevard |
|
Length (Mile): |
1.15 |
|
Project Status: |
In Design: |
100% Complete |
Design consultant: |
Crawford, Murphy & Tilly, Inc. |
|
Construction DBE Goal: |
15% |
|
Design Engineering Contract Amount: |
$ 199,801.82 |
|
Preliminary Plans Approved by MoDOT: |
February 2022 |
|
Public Open House: |
March 2022 |
|
ROW Status: RFQ Approved: |
July 2022 |
|
ROW (Easement) Acquisition: |
Fall 2022 |
|
ROW (Easement) Acquisition cost (26 Parcels): |
$ 91,092.75 |
|
Construction Contract: |
Raineri Construction, LLC | |
Project Construction Start: |
January 2, 2024 | |
Estimated Project Construction Administration cost*: |
$ 159,642.76 |
|
Estimated Project Construction cost*: |
$ 1,729,746.61 |
Please contact Richard Holesinger, City Engineer at (314) 822-5819 or holesire@kirkwoodmo.org regarding this project.
Last Updated: August 16, 2024